A sample operation breakdown with SAM of each operation has been shown below. In this article, only operation breakdown and operation SMVs are posted. Production layout will be posted in a separate article.
Standard time shown in the below chart is determined from Time Study. List of operations and SAM of operations may vary based on style and construction. This Operation breakdown has been sourced from a graduation project report of a NIFT student. This Project was done in Silver Sparks Apparel Limited, Bangalore.
Source: Scribd.com
Source: Scribd.com