6 Checklists for Bulk Fabric Cutting

Meeting the planned cut date (PCD) is hard. And you always get an urgent note…

What is Pilot Run in Garment Manufacturing?

The pilot run can be named as a trial production run. A pilot run is…

Production Planning and Control – the Concept and Definition

This is a guest post from Ashish Kumar Gupta. Production Planning is one of the…

Common Practices Followed to Control Fabric Shrinkage in Garment Manufacturing

Fabric shrinks when it is washed. This is one of the common facts of fabric…

Use Pivot Table and Become Smart in Report Making (Download Excel Template)

Report making is one of the daily activities for most of the garment manufacturers in…

What is Inline Inspection in the Garment Industry?

Inspection means checking the quality of work or a product. Inline Inspection means checking the…

4 Point System for Fabric Inspection: A Discussion Post

I guess you completely understand the use of 4 Point System and method of measuring…

What is Bundle Allowance?

You may already know that to determine Standard Time (SAM) using Time Study method various…

How to Produce Accurate Standard Times?

This is a guest submission from Sunaina Khanna Some times ago we had the opportunity…

Indian Garment Industry – A Vision Document

This is a guest post from Ashish Kumar Gupta As the production cost is increasing…