How to Produce Accurate Standard Times?

This is a guest submission from Sunaina Khanna Some times ago we had the opportunity…

No Image
Pros and Cons of Setting up Garment SAM Higher than Standard Time

In the previous post, we have discussed estimating garment SAM [1] based on IE’s experience.…

Secret Formula for Making Operation Bulletin for Beginners

Making an Operation Bulletin (OB) is not a big deal. If you understand sewing machines…

Survey Results: Factories Using PMTS based Software for Determining Garment SAM

In the last month, an online survey was conducted by OCS on the topic “Are…

List of MIS Reports Made by IE Department in Garment Factories

To manage the production floor, production line, and sewing operators' work, garment factories used to…

Duties and Responsibilities of Industrial Engineering Department

In this article, author has shared the list of duties and responsibilities of industrial engineering…

A Typical Day of an Industrial Engineer (Manager) in a Garment Export House

Meet Vineet Saini, a manager, Industrial Engineering Department, of a Delhi based leading garment export…

Are You Using Software for Determining Garment SAM? (Survey)

This is a quick survey to understand what percentage of garment factories are using PMTS software…

No Image
How to Use Performance Rating Calculating Basic Time?

In the article ‘Calculation of SAM using Time Study’ I have used operator performance rating…

What is Balancing Loss in Garment Production?

Prior to loading production to the line (for a new style), Industrial Engineers prepare an…