Question: When a production line runs two or more styles having different SAM how can I calculate the efficiency of that line per day? … asked by Alamrew Ayalneh
Not only you but many of others find problem calculating line efficiency on the day when one style is going to end and a new style is loaded to the same line. I am not clear when you face this problem
- Is multiple styles are running to the line at the same time? or
- The previous style is over with some output and a new style is loaded at the back of the line?
However, I am discussing this issue in details. I hope you will get the answer to your question from it. There are two ways to find line efficiency like,
Formula#1:
= (Total SAM of produced garments / Total worked hours*60)*100
Formula#2:
= (Total SAM produced by the line/Total worked hours * 60)*100
Most of the factories follow formula#1 to calculate line efficiency. As because
I have earlier post method of line efficiency calculation using this method. Click here to read it.
When two or more styles are running together in a line. How to use formula#1 to calculate line efficiency? Here is the formula –
= {(Total output of Style#1 * SAM of style#1) + (Total output of Style#2 * SAM of style#2)}*100 / (Total operators * shift hours * 60)
For example: In a line, 20 operators worked for 8 hours and line produces 200 pieces of style# A and 200 pieces of style# B. SAM of style# A is 15 minutes and style# A is 20 minutes.
Line efficiency %= ((200 * 15 + 200 *20)*100)/ (20 * 8 * 60)
= (3000+ 4000)*100/9600
= (7000/9600)*100
= 72.9%
Note that though this is widely used methods for line efficiency calculation you don’t get an accurate efficiency of the line. So to get accurate line efficiency figure use formula#2. You can use this formula for single style also.
For example, an operator makes two different operations of two different styles. SAM of operation#1 is 0.50 minute and operation#2 is 1 minute and she made 400 pieces for operation#1 and 200 pieces for operation#2. So Total SAM produced by the operator is equal to 400 minutes (400*0.5 +200 *1).
Finally, calculate line efficiency% by using formula#2.