Can you please tell me how to calculate pieces per hour of an operator. Let’s say average cycle time is 30 seconds. How to calculate the hourly production of the operator?
The production capacity from the cycle time is calculated using this formula.
Note: 1 hour = 3600 seconds
You need to add allowances to the average cycle time to estimate the production capacity more realistic. As you know, when you do cycle timing of an operator, she would have been working for her bundle and stitched few garments (operations cycle) one after another without taking a break.
In your example, the operation cycle time is 30 seconds. After adding 20 allowances, the calculated cycle will be 36 seconds. This is derived from (30 seconds x 1.20)= 36 seconds
Therefore, estimated production quantity per hour = (3600/36 ) = 100 pieces
Related post: How to calculate hourly production target from SAM?